Should a Replacement Front Door Swing In or Out?
Quick answer
Start by drawing the path of the door on both sides of the opening.
From the project. Documented scope. One ProVia Heritage fiberglass front entry with sidelights Project stage. Entry completed in December 2024 Project sources
Project photos by Contract Exteriors Mount Pleasant, South Carolina
Read the full article TranscriptRelated videos
All videosRelated articles
All articlesVideo transcript
Start by drawing the path of the door on both sides of the opening.
The same drawing gives you a chance to spot clashes early. Show the location of the current storm door if you plan to keep one. Include the handle positions and any porch hardware that sits near the opening. With two moving panels at one entry, ask the contractor to check how the two work together and what the selected products allow.
Ask the person preparing the order to label outdoors and indoors on a simple plan view. Put the hinges, handle and swing arrow on it. If the proposal uses a shorthand for handing, ask the estimator to show how it maps to that sketch for the actual product. A left or right label can sound obvious during a conversation, then be read differently by someone standing on the other side of the threshold.
Ask the estimator to document the whole opening, including frame, sill, hardware and finish work.

